The advanced layout feature has now ended as of April 2022
Articles in this section
- M201: Run the Workflow App as a Workflow System
- M202: Set the Deadline for Each Step
- M203: Single-Selection Branch and Concurrent Parallel Processing
- M204: Set a Loop Structure
- M205: Business Data Items
- M206: Mandatory Check and Input Format Check on Each Data Item
- M207: Setting Initial Values of Data Items
- M208: Set Options in the Upstream Step So They Can Be Used in the Downstream Step
- M209: Nomination by Organization and by Role
- M210: Designation of Downstream Operator in Upstream Step